Cumberland Trail Reports & Conditions

Status Trail Agesort ascending Info Work
Green/Open Lower Crafty Butcher 1 month 4 weeks

All logging debris has been removed by UROC maintenance crew. Fast and dry.

view
Green/Open Teapot 1 month 4 weeks

Trail in great condition. Dry and bare throughout. Clear of all blow downs.

view
Green/Open Lower Thirsty Beaver 1 month 4 weeks

A few wet spots persist. Trail is clear and dry for the most part.

view
Green/Open Short Line 2 months 2 weeks

Cleared a few blow down Alders from the trail (hand saw).

view
Green/Open Blue Collar 2 months 2 weeks view
Green/Open Middle Crafty Butcher 9 months 2 weeks view
Green/Open Space Nugget 9 months 2 weeks view
Green/Open Upper Crafty Butcher 9 months 2 weeks view
Green/Open Upper Thirsty Beaver 9 months 2 weeks view
Green/Open Steam Donkey 9 months 2 weeks view
Green/Open Teapot 9 months 2 weeks view
Green/Open Bear Buns 9 months 2 weeks view
Green/Open Off Broadway 9 months 2 weeks view
Green/Open Missing Link 9 months 2 weeks view
Green/Open Grub 11 months 2 weeks

A bit of recent work has helped put this trail back on the map. Please look before you leap.

trail work done view
Green/Open Entrails 11 months 2 weeks

An alternate ending to entrails. At the end hole connector/lower entrails intersection. Head right, about 8 feet later the trail begins on your left.

This a trail that links some great moderate slabs. Panty lines are in place for the two harder slabs.

Do not modify the trail, or the ghosts of trail builders past will seek revenge (your brakes will fail on horizon lines, your tires will flat when airborne, and you seat will make it a goal to hurt you where it counts).

The trail builder wrote this description. He really thinks it is perfect as is and would hate to see improvements.

Have Fun!

trail work done view
Green/Open Entrails 1 year 5 days view
Green/Open Short N Curly 1 year 2 months All good........trees cleared.......some mucky sections view
Green/Open Rugburn 1 year 3 months

Fallen trees are clear.:)

view
Amber/Some Issues Grub 1 year 3 months

Structures in disrepair........plans to fix structures as well as re-route at bottom into new unbuilt trail, Gravity. As well, trail will start higher up and accessed across from ?El Grande?

view
Green/Open Rugburn 1 year 3 months

Fallen trees have been cleared apparently.........

view
Red/Closed Stub 1 year 3 months

In need of serious work, if not a re-route in sections.

view
Amber/Some Issues Rugburn 1 year 3 months

Two trees fallen across trail. Couple near north end entrance and one on main climb.

view