20.0 miles
1,094 ft
-6,451 ft
1.8 miles
High Point

Please respect trail closures. The upper trails on this ride are closed in the early and late season due to snow and moisture on the trail and when shops and shuttle companies say the trail is closed it is for good reason.

3/4 Enchilada - Starting from Miners Basin and Hazard Country.

This is possibly one of the best mountain bike rides in the world. We have started the route from Miners Basin which is a common shuttle drop in the early and late season due to snow and moisture on the trails. In the heat of the summer it is possible to also start on Burrow Pass. This ride is long and quite challenging at times. Make sure that you bring lots of water and plenty of spare inner tubes. It is an accomplishment to do this ride without at least one flat tire in your group and don't be surprised if everyone has at least one flat even if you are running tubeless. The views are incredible and finishing down at the Colorado River hours later is pretty surreal. It is quite easy to ride along the road right back to your accommodation in Moab. If you do not think you will be up to a pedal home you can always plan ahead and leave a car at the bottom of the Porcupine Rim Trail.

We recommend using one of Moab's awesome shuttle companies for easy trail-head access.

Local Trail Association
Moab Mountain Bike Association (moabmba.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!


Post a Comment

You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Trails in Route

Hazard County3.0 miles
Kokopelli1.8 miles
UPS4,472 ft
Upper Porcupine ST659 ft
UPS Lower1.3 miles
LPS Alt2,956 ft
LPS4,229 ft
Porcupine Rim11.1 miles


  • Difficulty rating
    Black Diamond
  • Route Type
  • Bike type
  • Direction
    One Direction
  • Physical rating
More Stats for 3/4 Enchilada - Starting on Hazard County at Miners Basin parking - RideSpots.com mountain bike route
  • Altitude change
    -5,357 ft
  • Altitude min
    3,985 ft
  • Altitude start
    9,342 ft
  • Altitude end
    3,985 ft
  • Grade
  • Grade max
  • Grade min
  • Distance climb
    3.5 miles
  • Distance down
    15.4 miles
  • Distance flat
    1.1 miles
Avg: 5 (1 votes)
Layers winter
Map Style
Trail Style
  • ?
Trail transparency
Porc Rim - short version
Porc Rim - short version
trail: UPS
1:17 | 191 | comments: 4 | favs:
Oct 20, 2010
quick excerpt from "Most of the Enchilada" (we started at Hazard). Sadly, I didn't record the upper 2/3 of the ride at all, because it was heads...
Porcupine Rim Mountain Biking
Porcupine Rim Mountain Biking
trail: UPS
4:40 | 446 | comments: 0 | favs: 2
Apr 17, 2015
Riding down the Jimmy Keen, UPS, LPS, and Porcupine Rim trails near Moab, UT. Also made a quick stop at slickrock and pictured rocks in CO. ...
Moab The Whole Enchilada
Moab The Whole Enchilada
trail: UPS
4:13 | 515 | comments: 1 | favs: 1
May 22, 2015
The Whole Enchilada in Moab, with Jimmy Keen, Kokopelli, Ups, Porcupine Rim.

Recent Trail Reports Along Route

Porcupine Rim
Oct 7, 2016 @ 3:01pm
Oct 7, 2016
Oct 7, 2016 @ 3:01pm
Oct 7, 2016
UPS Lower
Oct 7, 2016 @ 3:01pm
Oct 7, 2016
Hazard County
Oct 7, 2016 @ 3:01pm
Oct 7, 2016
Prime conditions!
Upper Porcupine ST
Oct 7, 2016 @ 3:01pm
Oct 7, 2016
view all reports ยป
  • embed 3/4 Enchilada - Starting on Hazard County at Miners Basin parking - RideSpots.com route on your website
    • Updated on Tue 2016-03-08 @ 7:41pm
    • Submitted on Fri 2016-02-26 @ 2:36pm
    • By caradock & contributors
    • #1229 - 305 views
  • flag
  • login to download gpx or kml files.