Spring Trail Work Day 2018

Trail Day Details:

Update: STP's Spring Trail Work Day has been rescheduled to Saturday May 12 due to wet / snowy / icy / muddy conditions. Location, times, etc. are unchanged.
------

Dust off those work boots and get ready to do some trail fixin'!
Cady Hill is on the mend, but we've got a A LOT of work to do to get there. Many hands make light work and with enough people we can get Snake, Cady Hill Connector, and the Schween Haus Loops (among others) repaired and ridable in no time.

But we've got our work cut out for us this year so bring a few friends (as well as work gloves, snacks, and water). We'll have a limited number of tools on hand so if you have your own, mark them well and bring them along.

Following the trail work party, we'll gather to break bread and refuel with some local libations while enjoying the musical stylings of none other than Dale & Darcy. Rain date is Saturday May 12th. Meet at the Cady Hill Forest parking lot.

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
    • 2018-05-12 09:00:00 2018-05-12 13:00:00 America/New_York Spring Trail Work Day 2018 Update: STP's Spring Trail Work Day has been rescheduled to Saturday May 12 due to wet / snowy / icy / muddy conditions. Location, times, etc. are unchanged. ------ Dust off those work boots and get ready to do some trail fixin'! Cady Hill is https://www.trailforks.com/event/2617/ Cady Hill Forest Stowe Trails Partnership stowemtb@gmail.com
    • Subscribe
  • 0
    interested
  • 0
    going
close
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
  • By stoweshred STP
  • #2617 - 81 views
Audience: state
[flag]