Mount Ascension Directional Trails Worknight
Trail Day Details:

Please come join us for a trail work night on Cruse Control & Big Dorothy (backside Ascension trails) next Wednesday July 13 anytime after 5:30 pm. Both trails are riding well but need some TLC. Many hands make light work, and there's plenty that needs to be done

Drive through the lower gate off Arrowroot Road. and then follow the service road to the bridge at the bottom of the directional trails. Carpooling is encouraged due to limited parking. We will bring all the tools -- just bring yourselves, gloves, water, and a can-do attitude! We plan on being up on both trails from 5:30 until about 9 pm or until light and weather allows. However, show up anytime. Tools will be placed by the bridge, so if you show up later, just pick up a tool and walk up the trails until you see us.

Comments

Commenting is disabled for past events.

Trail

close
3D
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Snow Cover Partial
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Ideal
  • Dry
  • Very Dry
Directions to cruse-control-trail-upper trailhead (46.567710, -112.027160)
1,430 ft
Distance
-117 ft
Descent
00:02:44
Avg time
view trail detail
  • By evasive MBG
  • #6346 - 163 views
Audience: city
[flag]