close
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Ideal
  • Dry
  • Very Dry
Trail Ridden Direction
Trailforks scans users ridelogs to determine the most popular direction each trail is ridden. A good flowing trail network will have most trails flowing in a single direction according to their intension.
The colour categories are based on what percentage of riders are riding a trail in its intended direction.
  • > 96%
  • > 90%
  • > 80%
  • > 70%
  • > 50%
  • < 50%
Trail Last Ridden
Trailforks scans ridelogs to determine the last time a trail was ridden.
  • < 2 days
  • < 1 week
  • < 2 weeks
  • < 1 month
  • < 6 months
  • > 6 months
Trail Ridden Direction
The intended direction a trail should be ridden.
  • Downhill Only
  • Downhill Primary
  • Both Directions
  • Uphill Primary
  • Uphill Only
  • One Direction
Contribute Details
Colors indicate trail is missing specified detail.
  • Description
  • Photos
  • Description & Photos
  • Videos
Trail Popularity ?
Trailforks scans ridelogs to determine which trails are ridden the most in the last 9 months. Trails are compared with nearby trails in the same city region with a possible 25 colour shades. Think of this as a heatmap, more rides = more kinetic energy = warmer colors.
  • most popular
  • popular
  • less popular
  • not popular
ATV/ORV/OHV Filter
Max Vehicle Width
inches

Radar Time
LEGEND
Trail Difficulties
  • Access Road/Trail
  • White
  • Green
  • Blue
  • Black
  • Double Black Diamond

Trail Report Status
  • Clear / Green
  • Minor Issue / Yellow
  • Significant Issue / Amber
  • Closed

  • Land Owner Overlay
  • Wilderness (typically no bikes in USA)
  • BLM (public)
  • USFS (Wildlife sanctuaries darker than usfs)
  • State land
  • Indigenous
  • Military
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Ideal
  • Dry
  • Very Dry
  • Map Markers
  • trail Trail Head
  • photo Photo
  • place Directory Listing
  • region Riding Area
  • TTF TTF
  • Parking Parking
  • Viewpoint Viewpoint
  • Information Information
  • Warning Warning
  • Directions Directions
  • Sight Sight
  • Restrooms Restrooms
  • eBike Charging Point eBike Charging Point
  • Water Fountain/Source Water Fountain/Source
  • Gate Gate
  • Trail Sign Trail Sign
  • Table or Bench Table or Bench
  • Ladder Ladder
  • Stairs Stairs
  • Bridge Bridge
  • Boardwalk Boardwalk
  • Camping Camping
  • Cabin Cabin
  • Lodge Lodge
  • Bear Cache Bear Cache
  • Dock Dock
  • Ranger Station Ranger Station
  • Summit Summit
  • Other Other
      This area is one of 10 parcels of Open Space in Chelmsford, Ma. It is the largest of the 10 yet is still quite small by comparison to many of the areas we ride coming in at 130 acres total. Total because approximately 12 acres is either under water in the form of a pond which can be used for fishing/canoeing, or taken up by the town's soccer fields. Keep in mind as you read this that although small, through the efforts of Merrimack Valley NEMBA, it rides bigger than expected.


      Here is a link to the official map which is largely reproduced here: http://www.townofchelmsford.us/DocumentCenter/View/268/Russell-Mill---Public-Trail-Map?bidId=

      A few yars ago the town's Open Space Stewardship, of which Merrimack Valley is a partner, asked us if we would be interested in designing and building mountain bike trails on the property. This coming at a time when the Bruce Freeman Rail Trail was in the beginning stages of construction the town was very interested in increasing it's diversity of biking and pedestrian trails. We naturally accepted the challenge and proceeded to outline what this would mean for the property. Approximately 4-5 miles of technical trail (singletrack) would be added to the existing trail system originally consisting of a couple miles of old carriage road and doubletrack.

      This proposal was enthusiastically accepted by the Stewardship and the Conservation Commission, we were on our way. As an added note, part of our responsibilities in addition to the design and build of the trail system, was and still is, to work closely with the Stewardship in an effort to clean up the property, as there was a fair amount of illegal dumping in the back parking lot, assist in efforts to eliminate the illegal uses of the property, gps the property and be on a committee to develop a GIS based map of this and other properties and finally develop and install signage for user convenience and public safety. We had a lot to do

      After around around 18 months and we were about three quarters of the way to completion, although we all know these things are never complete. There is now nearly 5 miles of new singletrack, 6 new boardwalks, the site is considerably cleaner, illegal activity is almost non-existent and about half of the new signage is up. There are still several wet tread issues and small re-routes of old trail sections to deal with and we were hoping to be 95% complete by the end of that season.

      For those of you who have not yet experienced Russell Mill, you will find the new trails familiar if you've ridden Lowell/Dracut State Forest. This is a State Forest that MV has been working on for a number of years with co-operation with the DCR. We have taken our philosophy there and applied it to Russell Mill. Fun singletrack which appeals to all levels of riders is what we are after and judging by the feedback we have received in the last couple of years we are confident that this has been delivered.

      Russell Mill now sports 7 miles of trails ridden in one direction with enough connector trails that easily allow much of the system to be ridden forwards and backwards giving the potential for a 10 to 12 mile ride just at this site. One thing we have always attempted to include in our trail design is the ability to have enough of a different riding experience doing the same trail in reverse and make it easy to do so. We have learned a great deal from our great resources of trail design, NEMBA, IMBA, FOMBA and especially from the input of individual riders. We always try to incorporate Philip Keyes' "KISS" formula…KEEP IT SINGLETRACK STUPID.

      With that said let me jump back to the part of the last paragraph where it said "just at this site". This is because one other unique thing about this property besides being fully supported by the local community and authorities is that it lies equidistant between two other great riding areas. Within, in both cases a little over a mile of "road work", is Great Brook Farm/State Forest in Carlisle where I know many of you have ridden for years and in the other direction Billerica State Forest.

      Great Brook is known for being able to incorporate a 15+ mile solid intermediate ride into your schedule and allow for an ice cream/frappe stop to boot. An easy jaunt to the east is Billerica State Forest. Not known for an extensive or exciting riding experience, that will hopefully begin to change as MV gets more involved with the property. The DCR has expressed interest in having us work with them in evaluating the existing trail system and setting up a plan similar to what we have done at Lowell-Dracut. This would ultimately add another 7 to 10 miles of riding in the area giving the potential for 30+ miles worth of rides in the Chelmsford area alone, not to mention the ability to connect all the way to the PR in Bedford. Epic rides here we come!

      Russell Mill is open all year round. We have a scheduled Friday night ride starting from the parking lot off Mill Rd., Chelmsford, Ma. Very much like the Tuesday night ride at Lowell/Dracut, the start time is 5pm and we swing back to the lot at approximately 5:45 for those who can't get there at 5. When the snow begins to fly there is a scheduled Friday night snowshoe walk at Russell. We have dubbed event this "Friday Night Lights". This, like our rides, is open to everyone, based on the premise that exercise is a good thing, being out in the woods is a good thing, beating down the snow on the trails is a good thing (we ride in the winter too), goes from 5pm to around 8:30, and is allowed and supported by the town. Great town!

      Well hopefully this will create awareness and generate interest in MVs' latest trail project(s). Please feel free to check out the Russell Mill trails, whether you start at the lot or are extending a ride from Great Brook we hope to meet you out there sometime soon. As this is being written we are planning an Open House for the site on May 16th, hope maybe by the time you see this article you will have already taken the time to explore our newest endeavor and would consider hooking up with us on one of our rides or trail days.

      Check out this video Youtube of the Pump Track!
      Primary Trail Type: Cross-Country
      Land Status: City Managed
      Merrimack Education Center Parking google parking directions
      Access Info:
      Directions:
      130 Mill Rd, Chelmsford
      From route 3 in Chelmsford take exit 29 and head West. Take your first left on Mill Road and follow it 1.3 miles to the parking lot at the soccer fields
      Activities Click to view
      Region Details
      • 9
      • 9
      • 9
      • 1

      Region Status
      Open as of Apr 8, 2021
      Local Trail Association

      Stats

      Avg Trail Rating
      Trails (view details)
      28
      Trails Mountain Bike
      28
      Trails Hike
      28
      Trails Trail Running
      28
      Trails Snowshoe
      28
      Total Distance
      11 miles
      Total Descent
      909 ft
      Total Vertical
      144 ft
      Highest Trailhead
      260 ft
      Reports
      309
      Photos
      43
      Ridden Counter
      12,438

      Photos of Russell Mill Pond & Town Forest Mountain Bike

      25 |
      Nov 30, 2020 @ 8:26am
      Nov 30, 2020
      32 |
      Nov 10, 2020 @ 6:49pm
      Nov 10, 2020
      trail: Pump Track
      29 |
      Nov 3, 2020 @ 5:21pm
      Nov 3, 2020
      trail: Upper White
      104 |
      Sep 22, 2019 @ 6:43am
      Sep 22, 2019

      Videos of Russell Mill Pond & Town Forest Mountain Bike

      Green Trail  Thunder Mountain MTB lift park
      11:31 | 176 | Jul 10, 2015
      Russell Mill Pump Track

      0:44 | 521 | Oct 18, 2014
      youtuber Fatbiking Russell Mill Pond and Billerica Town...
      14:32 | 36 | Feb 10, 2021 , Chelmsford
      youtuber Fatbiking Russell Mill Pond and Billerica Town...
      14:32 | 33 | Feb 10, 2021 , Chelmsford

      Recent Trail Reports

      Activity Feed

      usernameactiontypetitledate
      user #1802095Boliver19riddentrailGateway to Billercia and 4 more
      Apr 10, 2021 @ 8:32pm
      2 days
      user #1791795natescanriddentrailMerrimack Education Center and 7 more
      Apr 9, 2021 @ 7:48pm
      Apr 9, 2021
      user #1791795natescanaddreportPump Track
      Apr 8, 2021 @ 9:19am
      Apr 8, 2021
      user #1791795natescanriddenskillparkRussell Mill Pump Track
      Apr 5, 2021 @ 9:06am
      Apr 5, 2021
      user #1635372tharvanekwishlistskillparkRussell Mill Pump Track
      Apr 1, 2021 @ 6:49pm
      Apr 1, 2021

      Recent Comments

      usernametypetitlecommentdate
      user #1791795natescanreportOrange Goose LoopAppreciate it, I also added a couple TTF's...
      Jan 14, 2021 @ 5:02pm
      Jan 14, 2021
      user #766481SofakingfastreportOrange Goose LoopDone
      Dec 4, 2020 @ 10:51am
      Dec 4, 2020
      user #766481SofakingfastreportOrange Goose LoopThank you Nate. This report is very helpful.
      Dec 2, 2020 @ 7:03pm
      Dec 2, 2020
      user #1013015scott4238trailOrange Goose LoopI prefer riding this in the opposite direction...
      Oct 19, 2020 @ 7:41am
      Oct 19, 2020
      user #1013015scott4238trailRed TrailI don't understand why this is rated black,...
      Oct 19, 2020 @ 7:36am
      Oct 19, 2020

      Activity Type Stats

      activitytypetrailsdistancedescentdescent distancetotal verticalratingglobal rankstate rankphotosreportsroutesridelogs
      Mountain Bike2811 miles909 ft4 miles144 ft
      #327#1494330915,110
      Hike2811 miles899 ft4 miles144 ft
      #224#11330712
      Trail Running2811 miles899 ft4 miles144 ft
      #227#1143079
      Snowshoe286 miles715 ft2 miles121 ft
      715
      • By tbubierTrailforks Pro Subscriber & contributors
      • Admins: MV NEMBA
      • #5265 - 6,327 views
      • russell mill pond & town forest activity log | embed map of Russell Mill Pond & Town Forest mountain bike trails | russell mill pond & town forest mountain biking points of interest
      • subscribe print map 3d map donate to earn trail karma!

      Downloading of trail gps tracks in kml & gpx formats is enabled for Russell Mill Pond & Town Forest.
      You must login to download files.