Trail work was done with the intention of improving how Longway rides going down. Scraped and capped a small section uphill of a technical root section, improved the berm downhill of the roots, dug a rock drainage and built up a small hit on the side of the trail.
  • trail work done
  • 2 volunteer hours
  • 7 attendees
  • 14 total work hours

Previous Reports

statusdatedescription
Jul 24, 2020 @ 5:19pm
Jul 24, 2020
Lots of dirt work on lower portion of longway. We built two new berms, looks awesome out there! view
Jul 24, 2020 @ 10:36am
Jul 24, 2020
Four of us spent two hours fixing some drainage issues and capping a few eroded tread areas. Capped 3 sections of trail, redefined numerous cross... view
May 11, 2020 @ 6:00pm
May 11, 2020
Minor trail erosion after the rock roll was repaired. view