Cleared a log from the trail.
  • trail work done
  • 1 volunteer hours
  • 4 attendees
  • 4 total work hours

Previous Reports

statusdatedescription
Apr 16, 2020 @ 1:50pm
Apr 16, 2020
Built 3 waterbars to help improve drainage and reduce erosion on an eroded section of trail. This location is approximately 1.25 mile from the... view
Mar 21, 2020 @ 5:35pm
Mar 21, 2020
After Thursday’s heavy rain, New Laurel was running 2” deep in water from the end of the power line near the top for about half the length... view
Mar 14, 2020 @ 11:07am
Mar 14, 2020
view

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login