Course is doing great. Big Left-Hander was rebuilt and the drainage pipe worked surprisingly well for the last rain. All lips have been re-done and the berm with a natural spring in it is now rideable.

Drop in now leads into a camber with a re-sized jump. Take a run-up and commit! About 6" taller on the lip so speed should be no issue.
Jump into berm has new lip as well, will carry your speed better laterally.

Please bring a shovel and water if you can, keep it riding smooth!

Also watch out for Ticks. We had a few sneaky ones latch on from the bushes at the top.

Previous Reports

no previous reports.

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login