Very bottom of Bananarama has had drainage installed, brake ruts removed, and a small jump added 04/07/2017. Head left to traverse around to run snake gully, the log ride then the traverse through the four cross track.
  • trail work done
  • 2 hours
  • 1 attendees

Previous Reports

no previous reports.

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login