Saturday MdO Workday. Rebuilt the apex and exit of switchback. Added peeler to raise berm and increase inslope. Adjusted exit radius to prevent constant overruns from riders going wide and off trail which has broken down outslope and caused tread sag.
  • trail work done
  • 5 volunteer hours
  • 8 attendees
  • 40 total work hours
close
Layers winter
Trail Style
  • ?
Activity Type
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Coordinates: 35.269285, -120.873679

Previous Reports

statusdatedescription
Mar 10, 2019 @ 8:59pm
Mar 10, 2019
There was plenty of grip even with the rain. An easy but lengthy climb. But it isn't a big deal unless it's your first time riding. A fun descent,... view
Mar 8, 2019 @ 1:00pm
Mar 8, 2019
Trail running great. Trail work perfomed on first switchback above upper Beebe intersection. Adjusted radius of upper backslope, added peeler... view
Mar 7, 2019 @ 9:10pm
Mar 7, 2019
Preparation of equipment and materials for workday view

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Official Trail Reporter

  • Central Coast Concerned Mountain Bikers
  • CCCMB