6 miles
Distance
1,435 ft
Climb
-1,435 ft
Descent
2,587 ft
High Point

This is an awesome ride on the Whistler South Side trails. You will start by climbing up the scenic and pretty basic Farside Trail, which parallels the Cheakamus River. You will end up doing a short section of fire road climbing up to HiHi which is a shortish but incredible descent on a new school flowy trail. You will then ride Highline which is generally a climb and it will connect you to Duncan's trail which is the gem of this ride. Expect a challenging ride on Duncan's as it has many short steep climbs and awesome technical challenges on the descent. You can start and finish in Function Junction, we suggest you park near Fineline Bike Shop which is right across the street from the Whistler Brewery... a perfect place for a post ride chill session.

Local Trail Association
Whistler Off-Road Cycling Association (www.worca.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Details

  • Riding area
  • Difficulty rating
    Black Diamond
  • Route Type
    Loop
  • Bike type
    AM, XC
  • Direction
    One Direction
  • Physical rating
    Hard
More Stats for HiHi, Highline, Duncan's Trail - Whistler, BC - Advanced Route mountain bike route
  • Altitude min
    1,950 ft
  • Altitude start
    1,960 ft
  • Altitude end
    1,960 ft
  • Grade max
    -57.269%
  • Grade min
    41.438%
  • Distance climb
    3 miles
  • Distance down
    2 miles
  • Distance flat
    1,588 ft
Avg: 4 (2 votes)
close
Layers winter
Trail Style
  • ?
Activity Type
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency

Recent Trail Reports Along Route

traildateconditiondescription
Farside
Nov 17, 2018 @ 8:06am
Nov 17, 2018
Open to MacLaurin's Crossing suspension bridge, Upper Farside is CLOSED above the bridge due to extensive fuel reduction/thinning works by Community Forest. https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
Eastside Main Road
Nov 17, 2018 @ 8:04am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
Highline
Nov 17, 2018 @ 8:03am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
HiHi
Nov 17, 2018 @ 8:03am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
Far Out 1
Nov 17, 2018 @ 8:03am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
more reports »
  • flag
  • login to download gpx or kml files.