3 miles
Distance
1,363 ft
Climb
-200 ft
Descent
3,255 ft
High Point

Access to Into the Mystic via Creekside, for those who might prefer more single track and tech than road riding. Parking options at Alpha Lake Park and Creekside Village parking garage, with plenty of options to stock up on food, beverages, or last minute bike parts at many the local shops. Also many options for food and beverage apres ride!

Local Trail Association
Whistler Off-Road Cycling Association (www.worca.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Details

  • Difficulty rating
    Blue
  • Bike type
    AM, XC
More Stats for Into the Mystic - Creekside Access mountain bike route
  • Altitude change
    1,163 ft
  • Altitude min
    2,092 ft
  • Altitude start
    2,092 ft
  • Altitude end
    3,255 ft
  • Grade
    8.403%
  • Grade max
    -38.052%
  • Grade min
    37.491%
  • Distance climb
    2 miles
  • Distance down
    2,472 ft
  • Distance flat
    1,290 ft
no votes yet
close
Layers winter
Map Style
Trail Style
  • ?
Trail transparency
'Three Guides & a Chef: Part Two'...
'Three Guides & a Chef: Part Two' presented by Bear Back Biking, Whistler
3:32 | 810 | comments: 1 | favs: 1
Jul 9, 2015
Bear back biking are proud to have another excellent team for the 2015 season. We have had some extremely talented staff work with us over the...
Danimal Berm
Danimal Berm
0:05 | 477 | comments: 1 | favs:
Jun 14, 2010
Adam on the wood berm on Danimal.
Danimal Berm
Danimal Berm
0:07 | 358 | comments: 2 | favs:
Jun 14, 2010
Tristan on the wood berm on Danimal.

Recent Trail Reports Along Route

traildateconditiondescription
Industrial Waste
Oct 28, 2017 @ 7:03am
Oct 28, 2017
Macitence is complete for the year, things might be a little soft till it rains a bit more. Trail rides much better as a climb and is a more fun decent. Try not to go full hoon till next year please.
Lower Sproatt
Oct 19, 2017 @ 5:44pm
Oct 19, 2017
Road construction is underway. please obey all signage. Work is expected to last until Nov 14
Rainbow-Sproatt Flank (Westside)
Sep 16, 2017 @ 10:16pm
Sep 16, 2017
Danimal Middle
Jul 20, 2017 @ 1:15am
Jul 20, 2017
Westside Powerlines
Jul 12, 2017 @ 4:17pm
Jul 12, 2017
more reports »
  • flag
  • login to download gpx or kml files.