4 miles
Distance
578 ft
Climb
-514 ft
Descent
2,139 ft
High Point

The heart of the Majura Forest consists of a loop of cross country trails. Some of these trails are old favourites that survived relatively unscathed. Trails such as Pitt Street, Dew Drop Inn, Mata Hari and Mudhoney. Combined with newly hand built trails by the volunteers of Majura Pines Trail Alliance, these trails make up a loop with plenty of options. All of these trails are two way increasing options available, but please do look out for oncoming riders, particularly at the weekends.

We think the looop rides best in a clockwise direction. Starting from the western end of the concrete underpass ramp, take the first trail on the left (Radicle).

Local Trail Association
Majura Pines Trail Alliance (majurapines.org)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Trails in Route

Radicle1,220 ft
Smitten Kitten1,519 ft
Innabaanya1,503 ft
Sleepy Hollow823 ft
Love Shack1,342 ft
Johnson699 ft
Fireroad531 ft
Telemark1,686 ft
PS21,217 ft
Dew Drop Inn1,237 ft
Mata Hari299 ft
Mudhoney456 ft
Bogs and Logs2,333 ft

Details

  • Riding area
  • Difficulty rating
    Blue
  • Direction
    Both Directions
  • Physical rating
    Moderate
More Stats for Majura XC Trails mountain bike route
  • Altitude change
    65 ft
  • Altitude min
    2,040 ft
  • Altitude start
    2,041 ft
  • Altitude end
    2,106 ft
  • Grade
    0.292%
  • Grade max
    -18.406%
  • Grade min
    21.101%
  • Distance climb
    2 miles
  • Distance down
    2 miles
  • Distance flat
    2,748 ft
no votes yet
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency

Recent Trail Reports Along Route

traildateconditiondescription
Fireroad
Jun 17, 2018 @ 7:30pm
Jun 17, 2018
All trails CLOSED for harvesting. Dangerous machinery operating. reporter
Telemark
Jun 17, 2018 @ 7:30pm
Jun 17, 2018
All trails CLOSED for harvesting. Dangerous machinery operating. reporter
Dew Drop Inn
Jun 17, 2018 @ 7:30pm
Jun 17, 2018
All trails CLOSED for harvesting. Dangerous machinery operating. reporter
Mata Hari
Jun 17, 2018 @ 7:30pm
Jun 17, 2018
All trails CLOSED for harvesting. Dangerous machinery operating. reporter
Mudhoney
Jun 17, 2018 @ 7:30pm
Jun 17, 2018
All trails CLOSED for harvesting. Dangerous machinery operating. reporter
more reports »
  • flag
  • login to download gpx or kml files.