4 miles
Distance
1,398 ft
Climb
-1,340 ft
Descent
1,525 ft
High Point

Muddbunnies Ladies Intermediate Ride Loop.

Ridden July 4, 2016

Local Trail Association
Fraser Valley Mountain Bikers Association (www.fvmba.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

1 Review & Comments

  • + 1
flag Louanne (Aug 16, 2016 at 9:43)
 It was great to join the Muddbunnies last night to try out some new trails while our own Vedder Mountain is closed. A great bunch of gals, very fun and encouraging. The trails were perfect for a beginner/intermediate rider like myself. Ups weren't that bad and only about 30 min of up before going down "junkyard zombie" a fun trail filled with some little surprises like parts of an old car that you ride over.....Would definitely return to these trails.
[Reply]

Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Details

  • Difficulty rating
    Blue
  • Bike type
    AM
More Stats for Muddbunnies Monday's Intermediate Loop (Ledgeview) mountain bike route
  • Altitude change
    58 ft
  • Altitude min
    892 ft
  • Altitude start
    892 ft
  • Altitude end
    950 ft
  • Grade
    0.246%
  • Grade max
    -43.671%
  • Grade min
    23.968%
  • Distance climb
    2 miles
  • Distance down
    2 miles
  • Distance flat
    840 ft
no votes yet
close
Layers winter
Map Style
Trail Style
  • ?
Trail transparency
Abbotsford Trail Clips 2017
Abbotsford Trail Clips 2017
0:59 | 21 | comments: 0 | favs:
Sep 4, 2017
Some short clips with Stu
paper route drops
paper route drops
1:01 | 75 | comments: 0 | favs:
Jun 28, 2017
sketchy old drops at ledgeview
OUt for a RiP
OUt for a RiP
3:37 | 129 | comments: 0 | favs:
Apr 30, 2017
riders Geoff watt richard kuhn apr 2017

Recent Trail Reports Along Route

traildateconditiondescription
Main Access
Dec 8, 2017 @ 10:05pm
3 days
Erosion and surface water continues to add challange to this climb route.
Junkyard Zombie
Dec 8, 2017 @ 10:05pm
3 days
Tree down in the berm before the jumps, will need a chainsaw to make jumps rideable. Another one before the clearing, handsaw//two rider breakage friendly. Major drainage issues in the new clearing, might require a large reroute along border.
dead reckoning
Dec 8, 2017 @ 10:05pm
3 days
Lip of the first of the double drop has yet again been wrecked by people rolling it and someone removing the log keeper.
Paper Route
Dec 6, 2017 @ 7:41pm
Dec 6, 2017
Majority of the trail is frozen and hard packed but there are some muddy sections and wet leafy sections. This sunny week has made it really rideable and fun. GET OUT THERE ASAP. 2 ft hole at the end of the trail that the rider should be aware of.
J.Z. Jr.
Nov 22, 2017 @ 1:43pm
Nov 22, 2017
Did some drainage work to divert water from the trail.
more reports »
  • flag
  • login to download gpx or kml files.