4 miles
Distance
304 ft
Climb
-813 ft
Descent
1,328 ft
High Point

This is a fun loop for those looking to do a nice easy ride up and a fun way down with some flow and technical sections.

Route Supporters
Local Trail Association
Nanaimo Mountain Bike Club (nanaimomountainbikeclub.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Trails in Route

Bruin1,214 ft
Mal U436 ft
Thunder Road2,385 ft
Gateway2,969 ft
Armageddon2,684 ft
TNT1,332 ft
access track1,381 ft
Fine China upper2,713 ft
Fine China Lower Trail1,070 ft
253 Access1,155 ft
Bee Line902 ft
Wolverine1,385 ft
Jail948 ft

Details

  • Riding area
  • Difficulty rating
    Blue
  • Route Type
    Loop
  • Bike type
    AM
  • Direction
    One Direction
  • Physical rating
    Moderate
  • Ridelogs
    4
More Stats for NMBC Recommended Route 1 mountain bike route
  • Altitude min
    659 ft
  • Altitude start
    1,168 ft
  • Altitude end
    659 ft
  • Grade
    -2.41%
  • Grade max
    -19.587%
  • Grade min
    16.562%
  • Distance climb
    1 miles
  • Distance down
    2 miles
  • Distance flat
    1,451 ft
no votes yet
close
Layers winter
Trail Style
  • ?
Activity Type
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency
474 | 1 comments
Finer China - Nanaimo - Upper, Lower and Main
Finer China - Nanaimo - Upper, Lower and Main
7:08 | 72 | comments: 0 | favs:
Aug 17, 2018
Finer China - Nanaimo - Upper, Lower and Main
Finer China - Nanaimo - Upper, Lower and Main
7:08 | 95 | comments: 0 | favs:
Aug 17, 2018
Fine China - pump and jump
Fine China - pump and jump
1:07 | 465 | comments: 0 | favs:
Jan 9, 2017
Fun pump style trail

Recent Trail Reports Along Route

traildateconditiondescription
TNT
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Armageddon
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Bruin
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Mal U
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Gateway
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
more reports »
  • flag
  • login to download gpx or kml files.