4 miles
Distance
807 ft
Climb
-223 ft
Descent
1,326 ft
High Point

This is the official corridor route on the north side of Weigles road as part of the Timberwest - RDN and Nanaimo Mountain Bike Club Land use agreement.

There are no biosolid applications on 30m of either side of this route.

Local Trail Association
Nanaimo Mountain Bike Club (nanaimomountainbikeclub.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

2 Reviews & Comments

  • + 2
flag canadaka Mod Plus TFADMIN (Nov 7, 2018 at 17:34)
 That is good to know, the poo free route!
[Reply]
  • + 1
flag DSPhoto NMBC (Nov 7, 2018 at 17:52)
 You bet!!
[Reply]

Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Trails in Route

Details

  • Riding area
  • Difficulty rating
    Blue
  • Route Type
    Point to Point
  • Bike type
    AM, XC
  • Direction
    Both Directions
  • Physical rating
    Moderate
More Stats for North Side Doumont Corridor mountain bike route
  • Altitude change
    584 ft
  • Altitude min
    742 ft
  • Altitude start
    742 ft
  • Altitude end
    1,326 ft
  • Grade
    3.077%
  • Grade max
    -17.398%
  • Grade min
    22.788%
  • Distance climb
    2 miles
  • Distance down
    4,626 ft
  • Distance flat
    3,305 ft
no votes yet
close
Layers winter
Trail Style
  • ?
Activity Type
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency
Doumont
Doumont
3:37 | 200 | comments: 0 | favs:
Jun 7, 2015
Rotten Rooter trail up Doumont
Rhino
Rhino
trail: Rhino
4:19 | 263 | comments: 0 | favs:
Jun 3, 2015
Rhino trail up Doumont road

Recent Trail Reports Along Route

traildateconditiondescription
Big Rock
Nov 6, 2018 @ 4:25pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Rhino
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Old Car
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Gateway
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
Snakes & Ladders
Nov 6, 2018 @ 4:24pm
Nov 6, 2018
Temporary closures for road construction Monday to Friday 7am to 5pm. reporter
more reports »
  • flag
  • login to download gpx or kml files.