2 miles
Distance
136 ft
Climb
-1,555 ft
Descent
1,864 ft
High Point

One of the most popular shuttle routes on the mountain. Tons of fun with seemingly endless flow.

Links

Local Trail Association
Fraser Valley Mountain Bikers Association (www.fvmba.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Trails in Route

Details

  • Riding area
  • Difficulty rating
    Blue
  • Route Type
    Shuttled
  • Bike type
    DH, AM
  • Direction
    One Direction
  • Physical rating
    Moderate
  • Ridelogs
    16
More Stats for One of the most popular shuttle laps of the mountain mountain bike route
  • Altitude change
    -1,420 ft
  • Altitude min
    444 ft
  • Altitude start
    1,864 ft
  • Altitude end
    444 ft
  • Grade
    -11.675%
  • Grade max
    -51.388%
  • Grade min
    30.956%
  • Distance climb
    1,347 ft
  • Distance down
    2 miles
  • Distance flat
    620 ft
no votes yet
close
Layers winter
Trail Style
  • ?
Activity Type
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency
Autumn Ride
Autumn Ride
trail: Terdferg
2:03 | 103 | comments: 1 | favs: 1
Oct 24, 2018
Autumn Ride
Vedder Mtn
Vedder Mtn
trail: Femur
11:45 | 93 | comments: 0 | favs:
Jul 14, 2018
Vedder Mtn
Vedder Mtn
11:45 | 54 | comments: 0 | favs:
Jul 14, 2018

Recent Trail Reports Along Route

traildateconditiondescription
2Cents
Nov 15, 2018 @ 8:23am
22 hours
VERY WET - large pools of water on the trail after the heavy rain. Tried to kick out drains, but the pools are too deep. Should drain in the next few days.
Hidden Pleasures
Nov 15, 2018 @ 8:21am
22 hours
Tree down partially covering landing of the last large table. (right before Terd Ferg starts) Be cautious!
Skidder
Nov 10, 2018 @ 12:54pm
Nov 10, 2018
A tree is down and about 1/3 of the way out into the landing on the table, after the step down.
Terdferg
Oct 27, 2018 @ 10:22am
Oct 27, 2018
Couple of big puddles and some pretty big bomb holes, but otherwise clear.
Femur
Oct 27, 2018 @ 10:22am
Oct 27, 2018
Awesome.
more reports »
  • flag
  • login to download gpx or kml files.