7 miles
Distance
631 ft
Climb
-640 ft
Descent
492 ft
High Point

This is a quick little couple of dirt path loops strung together. Good for a cyclocross bike, gravel bike, hybrid, or for a novice mountain biker. These trails often function well in winter and spring when other trails are too snowy, icy, or muddy.

Local Trail Association
Toronto Off-Road Bicycling Association (torontooffroad.blogspot.ca)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Details

  • Riding area
  • Difficulty rating
    Green
  • Route Type
    Loop
  • Bike type
    DH, AM, XC, DJ, Fat, Adaptive MTB, CX, Uni
  • Direction
    Both Directions
  • Physical rating
    Moderate
More Stats for Quick and Dirty CX loops mountain bike route
  • Altitude min
    249 ft
  • Altitude start
    262 ft
  • Altitude end
    254 ft
  • Grade
    -0.023%
  • Grade max
    -28.612%
  • Grade min
    20.947%
  • Distance climb
    3 miles
  • Distance down
    3 miles
  • Distance flat
    3,770 ft
Avg: 4 (2 votes)

  • view (1)
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency
Mountain Biking in Toronto
Mountain Biking in Toronto
280 | comments: 0 | favs:
Jun 23, 2017
youtuber Brickworks and Crothers Woods - Toronto
Brickworks and Crothers Woods - Toronto
trail: CPR
178 | comments: 0 | favs:
Jun 23, 2017

Recent Trail Reports Along Route

traildateconditiondescription
Pottery Road to 3 Rocks
Aug 11, 2018 @ 2:52pm
2 days
Someone has been spreading glass shards on the section between the Sun Valley access trail and the fork with the Bayview access trail.
The Flats
Aug 1, 2018 @ 2:59pm
Aug 1, 2018
All clear. Overgrown here and there.
Redway Access Trail
Jul 12, 2018 @ 7:59am
Jul 12, 2018
Crothers Trail Stewardship Team: Moved short section of trail uphill a bit away from large hole adjacent to trail. Began clearing brush (mostly stinging nettle) along open stretch of trail leading to lower Redway trailhead Next week: Back in the same area, continuing to clear brush and dealing with other minor trail tread issues For more info, contact trails@toronto.ca
reporter
Moore Park Ravine
Jul 8, 2018 @ 11:10am
Jul 8, 2018
At Chorley Park the trail is blocked off. However, there's a well worn detour on the east side of the construction--no need to dismount. At the bottom of the ravine, past Brickworks, where the trail meets Bayview Connector, you can again find a little trail to exit/enter.
Brickworks Connector
Jun 26, 2018 @ 9:53pm
Jun 26, 2018
more reports »
  • flag
  • login to download gpx or kml files.