10 miles
Distance
1,592 ft
Climb
-1,597 ft
Descent
474 ft
High Point

Please note that whilst we know there are much better trails in the area that we intended to use we have been restricted by the Land Owners Quensland Parks and Wildlife as land managers to these stages only.

Round 1 of the Shimano Enduro Tour at Nerang on the Gold Coast.

E-bikes to race on the same stages on the Saturday wth a 1.5hour time limit.

Local Trail Association
Nerang Trail Care Alliance (www.instagram.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Route Sections

1 Stage 1
2 Stage 2
3 Stage 3
4 Stage 5
5 Stage 4

Details

  • Race Course
  • Race Date
    Sunday October 14, 2018 at 12:00am
  • Riding area
  • Difficulty rating
    Blue
More Stats for Shimano Enduro Tour Gold Coast mountain bike route
  • Altitude change
    -6 ft
  • Altitude min
    35 ft
  • Altitude start
    44 ft
  • Altitude end
    38 ft
  • Grade
    -0.011%
  • Grade max
    -21.477%
  • Grade min
    21.477%
  • Distance climb
    5 miles
  • Distance down
    5 miles
  • Distance flat
    3,157 ft
no votes yet
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency
Barneys
Barneys
trail: Barneys
1:44 | 20 | comments: 0 | favs:
Sep 27, 2018

Recent Trail Reports Along Route

traildateconditiondescription
New Exit Track (Roys)
Aug 31, 2018 @ 3:45pm
Aug 31, 2018
Petes Track
Aug 31, 2018 @ 3:45pm
Aug 31, 2018
Barneys
Aug 31, 2018 @ 3:45pm
Aug 31, 2018
Mongrels
Aug 25, 2018 @ 2:49pm
Aug 25, 2018
Loop 1 Down-Comm Track
Aug 17, 2018 @ 4:12pm
Aug 17, 2018
more reports »
  • flag
  • login to download gpx or kml files.