8 miles
Distance
1,560 ft
Climb
-1,494 ft
Descent
2,477 ft
High Point

Classic Tour De Trash from BHA, Cascade Environmental, Whistler Village Sports, Home Hardware, Gone Eatery, Whistler Brewing Co.

Local Trail Association
Whistler Off-Road Cycling Association (www.worca.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Route Sections

1 Timed Section
  • 8 miles distance
  • 1,559 ft climb
  • -1,493 ft descent

Details

  • Race Course
  • Riding area
  • Difficulty rating
    Green
  • Route Type
    Point to Point
  • Bike type
    XC
  • Direction
    One Direction
  • Physical rating
    Hard
More Stats for TOONIE June 22nd - Tour De Trash mountain bike route
  • Altitude change
    66 ft
  • Altitude min
    1,844 ft
  • Altitude start
    1,942 ft
  • Altitude end
    2,008 ft
  • Grade
    0.165%
  • Grade max
    -39.616%
  • Grade min
    50.776%
  • Distance climb
    4 miles
  • Distance down
    3 miles
  • Distance flat
    3,115 ft
no votes yet
close
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
LEGEND
Trail Difficulties
  • Access Road/Trail
  • White
  • Green
  • Blue
  • Black
  • Double Black Diamond

Trail Report Status
  • Clear / Green
  • Minor Issue / Yellow
  • Significant Issue / Amber
  • Closed or Major Issue / Red

  • Land Owner Overlay
  • Wilderness (typically no bikes in USA)
  • BLM (public)
  • USFS (Wildlife sanctuaries darker than usfs)
  • State land
  • Indigenous
  • Military
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
  • Map Markers
  • trail Trail Head
  • photo Photo
  • place Directory Listing
  • region Riding Area
  • TTF TTF
  • Parking Parking
  • Viewpoint Viewpoint
  • Information Information
  • Warning Warning
  • Directions Directions
  • Water Fountain/Source Water Fountain/Source
  • Sight Sight
  • Restrooms Restrooms
  • Gate Gate
  • Camping Camping
  • Trail Sign Trail Sign
  • Table or Bench Table or Bench
  • Other Other
Trail transparency
High Side and HiHi | Rider POV HD 4K |...
High Side and HiHi | Rider POV HD 4K | Mountain Biking in Whistler
trail: HiHi
5:33 | 45 | comments: 0 | favs:
Jul 13, 2018
Trash Crash
Trash Crash
trail: Trash
0:06 | 77 | comments: 0 | favs:
Oct 3, 2017
Slippery when wet.
Trash not crashing
Trash not crashing
trail: Trash
0:09 | 40 | comments: 0 | favs:
Oct 3, 2017
Not crashing on trash

Recent Trail Reports Along Route

traildateconditiondescription
Farside
Nov 17, 2018 @ 8:06am
Nov 17, 2018
Open to MacLaurin's Crossing suspension bridge, Upper Farside is CLOSED above the bridge due to extensive fuel reduction/thinning works by Community Forest. https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
Eastside Main Road
Nov 17, 2018 @ 8:04am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
Highline
Nov 17, 2018 @ 8:03am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
HiHi
Nov 17, 2018 @ 8:03am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
Far Out 1
Nov 17, 2018 @ 8:03am
Nov 17, 2018
CLOSED until Spring 2019 for major fuel reduction/thinning works by Community Forest. Major work zone with tree falling and heavy equipment working, STAY OUT! https://www.whistler.ca/media/news/closure-eastside-main-cheakamus-lake-forest-service-road-all-public reporter
more reports »
  • flag
  • login to download gpx or kml files.