27 miles
Distance
2,004 ft
Climb
-2,433 ft
Descent
3,293 ft
High Point

The Trans Canada Trail Route is the Chief Isadore Trail which is half rail trail and half 1.2 meter width gravel enhanced single track. There are a couple of short road sections near Wardner. The route starts at the Cranbrook Visitor Center on 23rd St. North and terminates at the Wardner Community Park.

Route Supporters
Local Trail Association
Wildhorse Cycling Club (bikewildhorse.ca)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Details

  • Difficulty rating
    Green
  • Route Type
    Point to Point
  • Bike type
    AM, XC
  • Direction
    Both Directions
  • Physical rating
    Easy
More Stats for Trans Canada Trail, Chief Isadore Trail, (Cranbrook to Wardner) mountain bike route
  • Altitude change
    -429 ft
  • Altitude min
    2,472 ft
  • Altitude start
    2,945 ft
  • Altitude end
    2,516 ft
  • Grade
    -0.302%
  • Grade max
    -21.34%
  • Grade min
    25.936%
  • Distance climb
    9 miles
  • Distance down
    13 miles
  • Distance flat
    4 miles
no votes yet
close
Layers winter
Map Style
Trail Style
  • ?
Trail transparency

Recent Trail Reports Along Route

traildateconditiondescription
Mayook Trail
Sep 18, 2017 @ 5:01pm
Sep 18, 2017
Wardner Rail Trail
Jul 14, 2017 @ 4:00pm
Jul 14, 2017
Rampart Prairie Connector
Jul 7, 2017 @ 4:05pm
Jul 7, 2017
Minor Water drainage issue, standing water on trail surface at Rampart Rest Area next to pond. Reroute through quarry road for 40 meters. Also standing water at 6km marker of the loop. Temporary bypass trail built around standing water. reporter
Steamboat Hill
Jul 2, 2017 @ 6:37pm
Jul 2, 2017
Wardner Highway 3 ROW Trail
Jul 2, 2017 @ 6:37pm
Jul 2, 2017
more reports »
  • flag
  • login to download gpx or kml files.