6 miles
Distance
2,037 ft
Climb
-2,143 ft
Descent
3,679 ft
High Point

No description for WORCA Toonie - Aug. 25, 2016 route has been added yet! Submit one here.

Links

Local Trail Association
Whistler Off-Road Cycling Association (www.worca.com)
Please consider joining or donating to the local riding association to support trail development & maintenance.
donate to earn trail karma!

Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Route POI

Aid StationFirst AidAid Station
CheckpointMarshalCheckpoint
CheckpointMarshalCheckpoint
CheckpointMarshalCheckpoint
CheckpointMarshalCheckpoint
CheckpointMarshalCheckpoint
CheckpointMarshalCheckpoint

Details

  • Race Course
  • Riding area
  • Difficulty rating
    Blue
  • Route Type
    Point to Point
  • Bike type
    AM, XC
  • Direction
    One Direction
  • Physical rating
    Moderate
More Stats for WORCA Toonie - Aug. 25, 2016 mountain bike route
  • Altitude change
    -106 ft
  • Altitude min
    2,199 ft
  • Altitude start
    2,380 ft
  • Altitude end
    2,274 ft
  • Grade
    -0.328%
  • Grade max
    -56.45%
  • Grade min
    37.472%
  • Distance climb
    3 miles
  • Distance down
    3 miles
  • Distance flat
    805 ft
no votes yet
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Trail transparency
First Ride Back
First Ride Back
trail: Billy Epic
1:43 | 105 | comments: 2 | favs:
Jun 5, 2018
An injury kept me off my bike for over 3 months, this was my first ride back. One of my favourite trails in Whistler in some of the most beautiful...

Recent Trail Reports Along Route

traildateconditiondescription
Whip Me Snip Me
Aug 14, 2018 @ 3:35pm
11 hours
Billy Epic
Aug 13, 2018 @ 10:50am
2 days
Old Binty's
Aug 13, 2018 @ 10:50am
2 days
Lower 27 Switchbacks
Jul 23, 2018 @ 10:15am
Jul 23, 2018
RMOW Trail Crew reworking this tail as multi use, downhill primary, intermediate flow trail. Trail remains open. Mini excavator and tracked dumper with hand crew working Mon-Thurs. Use caution and make contact with operator when near machinery. reporter
Twenty-Seven Switchbacks
Jul 9, 2018 @ 10:20am
Jul 9, 2018
more reports »
  • flag
  • login to download gpx or kml files.