no votes yet
Pump track, Drop Zone, log rides, Flow Trail with 3m high wall rides. Built 2016 by the Land Manager; Capital Regional District (CRD) employees: Adam, Cam, Colin, Brian. Designed by Daniel Scott.
Files
Local Trail Association
local trail association
SIMBS (simbs.com)

Reports

datedescription
Dec 18, 2016 @ 8:49pm
Dec 18, 2016
Easy Rider modified to accommodate small riders and also to help stem water flow down the trail. view
Dec 13, 2016 @ 5:58pm
Dec 13, 2016
The pump track and flow trail are asleep under a blanket of snow. view
Nov 25, 2016 @ 8:51pm
Nov 25, 2016
Transitions / landings in the drop zones armoured to prevent braking bumps and compaction of the landing zone. view
Nov 15, 2016 @ 8:48pm
Nov 15, 2016
Hydro cutting trees under the transmission lines. view
Nov 4, 2016 @ 6:19am
Nov 4, 2016
Hydro seeding was done. Recent erosion control also. Some semi-finishing touches underway but the CRD will be back in the spring to smooth out... view
view all reports »
close

Photos

no photos have been added for Technical Training Area (aka TTA) yet, add a photo.

Videos

no videos have been added for Technical Training Area (aka TTA) yet, add a video.

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login
  • By SIMBSTrailsDirector SIMBS & contributors
  • #4181 - 265 views