1 miles
Distance
141 ft
Climb
-354 ft
Descent
00:15:13
Avg time
Trail Supporters, Builders & Maintainers of 116 Spaghetti Factory Trail

Details

  • Riding area
    Post Canyon
    Hood River, Oregon
  • AKA
    Trail 116
  • Difficulty rating
  • Trail type
    Singletrack
  • Bike type
    AM, XC
  • Trail Usage
    Biking Primary
  • Direction
    Both Directions
    Popular direction shown
  • Climb Difficulty
    Blue
  • Physical rating
    Moderate
  • eBike Allowed
  • Global Ranking
  • Land Manager

A great trail to connect from the bottom of GP over to Mitchell Ridge. A short steep climb at the start and then swoopy ups, downs, and turns. Can also be used as a good XC loop after climbing Mobius Strip to combine with Charlies Trail.

Local Trail Association
More Stats for 116 Spaghetti Factory mountain bike trail
  • Altitude change
    -213 ft
  • Altitude min
    1,267 ft
  • Altitude max
    1,487 ft
  • Altitude start
    1,487 ft
  • Altitude end
    1,274 ft
  • Grade
    -2.969%
  • Grade max
    -25.964%
  • Grade min
    15.217%
  • Distance climb
    2,226 ft
  • Distance down
    4,327 ft
  • Distance flat
    606 ft
  • Avg time
    00:15:13
  • Avg reverse time
    00:11:23
  • view trail stats
Status:
on Jul 12, 2018
Variable
Avg: 3.2 (10 votes)

view (821)
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Directions to 116-spaghetti-factory trailhead (45.688230, -121.609220)
update trails status or condition

116 Spaghetti... Trail Reports

datedescription
Jul 12, 2018 @ 5:40pm
Jul 12, 2018
Mar 12, 2018 @ 1:16pm
Mar 12, 2018
Variable conditions. Trails down low with sun exposure will be dry. Higher trails above BMS are still snow covered.
Mar 12, 2018 @ 12:00pm
Mar 12, 2018
Mar 8, 2018 @ 11:37am
Mar 8, 2018
Conditions have improved and some trails may be rideable, however, please be mindful of potential freeze/thaw conditions and muddy areas
Mar 1, 2018 @ 8:58am
Mar 1, 2018
Post Canyon closed due to freeze/thaw cycle and major potential for trail damage
view all reports »

Photos

more »
4 |
Jul 1, 2018 @ 3:41pm
Jul 1, 2018
116 Spaghetti Factory
2 |
Jul 1, 2018 @ 3:41pm
Jul 1, 2018
116 Spaghetti Factory
4 |
Jul 1, 2018 @ 3:41pm
Jul 1, 2018
116 Spaghetti Factory
2 |
Jul 1, 2018 @ 3:41pm
Jul 1, 2018
116 Spaghetti Factory

Routes with this trail

titleratingdistance
Classic Post Canyon Hot Lap
9 miles
2017 CDC Post Canyon Enduro - Beginner/13U Youth race
4 miles

Trail Products

Reviews / Comments

No reviews yet, be the first to write a review or ask a question.
Use trail reports to comment on trail conditions.


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Videos

no videos have been added for 116 Spaghetti Factory yet, add a video.
  • subscribe
  • flag
  • login to download gpx or kml files.