6 miles
Distance
425 ft
Climb
-295 ft
Descent
00:40:28
Avg time

Details

  • Riding area
    Etobicoke Creek
    Etobicoke, Ontario
  • AKA
    etobicoke creek
  • Difficulty rating
  • Trail type
    Gravel Path
  • Bike type
    DH, AM, XC, DJ, Fat
  • Trail Usage
    Multi-use
  • Direction
    Both Directions
    Popular direction shown
  • Climb Difficulty
    Green
  • Physical rating
    Easy
  • eBike Allowed
  • Global Ranking
  • Year Opened
    2015
  • Land Manager

This is Mississauga's main trunk of the Etobicoke Creek Trail. It runs parallel to the creek for the entire length. It goes from Garnetwood park on Burnhamthorpe to just past the airport. Most of the trail is gravel with some patches of asphalt. There are several steel bridges that cross the creek. There is a small section which isn't complete and some people may have to carry their bikes across. Mountain bikers will have no issues going over the roots and rocks. Along the trail there are several single tracks that go off into the woods on both sides of the creek.

Access Info

From the north you can access the trail across the Tim Hortons at the corner of Mid-way blvd. and Dixie road. At the south access is from Garnetwood park on Burhamthorpe near the Mississauga eastern border.

This trail is Unsanctioned, Ride at your own Risk!

More Stats for Etobicoke Creek Main (Mississauga) mountain bike trail
  • Altitude change
    132 ft
  • Altitude min
    423 ft
  • Altitude max
    556 ft
  • Altitude start
    425 ft
  • Altitude end
    556 ft
  • Grade
    0.436%
  • Grade max
    -33.413%
  • Grade min
    19.192%
  • Distance climb
    3 miles
  • Distance down
    2 miles
  • Distance flat
    1 miles
  • Avg time
    00:40:28
  • view trail stats
Status:
on Apr 20, 2018
Dry
Avg: 4 (2 votes)

view (6)
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Directions to etobicoke-creek-main-mississauga trailhead (43.637300, -79.585600)
update trails status or condition

Etobicoke Creek... Trail Reports

datedescription
Apr 20, 2018 @ 6:34am
Apr 20, 2018
Sep 1, 2017 @ 2:36pm
Sep 1, 2017
mostly paved
view all reports »

Photos

more »
1 |
Oct 8, 2018 @ 12:25pm
Oct 8, 2018
Etobicoke Creek Main (Mississauga)
13 |
Sep 16, 2018 @ 2:09pm
Sep 16, 2018
Etobicoke Creek Main (Mississauga)
8 |
Sep 16, 2018 @ 2:09pm
Sep 16, 2018
Etobicoke Creek Main (Mississauga)
7 |
Sep 16, 2018 @ 12:07pm
Sep 16, 2018
Etobicoke Creek Main (Mississauga)

Trail Lists

1 Review & Comments

  • + 0
flag Hrahmed (Aug 29, 2018 at 17:07)
 This trail is closed when going south before the 401. Hand to take a long detour to get across the 401
[Reply]

Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Videos

no videos have been added for Etobicoke Creek Main (Mississauga) yet, add a video.
  • subscribe
  • flag
  • login to download gpx or kml files.