This trail is flagged for cleanup, the GPS track most likely crosses itself. You can help by editing the trail and cleaning up the GPS points.
This trail is planned
3 miles
Distance
292 ft
Climb
-1,772 ft
Descent
1 miles
High Point
Trail Supporters, Builders & Maintainers of Under Construction Trail

Under Construction Details

  • Riding area
    Mt. Swansea
    Invermere, British Columbia
  • Difficulty rating
  • Trail type
    Singletrack
  • Bike type
    AM
  • Trail Usage
    Biking Primary
  • Direction
    Downhill Primary
    Popular direction shown
  • Climb Difficulty
    Blue
  • Physical rating
    Moderate
  • eBike Allowed

*Under Construction - to open fall 2018 or spring 2019* Scenic and flowy machine built trail that winds it's way down the South Ridge of Mount Swansea, then down the to the top of Hula Girl. Very impressive views of the Columbia Valley.

Disclaimer

Under construction!

Local Trail Association
More Stats for Under Construction mountain bike trail
  • Altitude change
    -1,480 ft
  • Altitude min
    4,176 ft
  • Altitude start
    5,655 ft
  • Altitude end
    4,176 ft
  • Grade
    -9.568%
  • Grade max
    -55.612%
  • Grade min
    40.049%
  • Distance climb
    3,208 ft
  • Distance down
    2 miles
  • Distance flat
    667 ft
  • view trail stats
Status:
on May 8, 2018
Dry
no votes yet

view (8)
close
Layers winter
Trail Style
  • ?
Trail Conditions
  • Unknown
  • Snow Packed
  • Snow Covered
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Dry
  • Very Dry
Directions to under-construction-121741 trailhead (50.506460, -115.946381)
update trails status or condition

Under Construction Trail Reports

datedescription
May 8, 2018 @ 1:19pm
May 8, 2018
reporter
Apr 23, 2018 @ 9:00am
Apr 23, 2018
Apr 16, 2018 @ 1:41pm
Apr 16, 2018
reporter Still snow covered - the melt is taking a while this year, so it's going to be a late opening!
Apr 14, 2018 @ 11:00am
Apr 14, 2018
Apr 12, 2018 @ 7:55am
Apr 12, 2018
reporter Still snow covered - the melt is taking a while this year, so it's going to be a late opening!
view all reports »

Photos

no photos have been added for Under Construction yet, add a photo.

Reviews / Comments

No reviews yet, be the first to write a review or ask a question.
Use trail reports to comment on trail conditions.


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login

Videos

no videos have been added for Under Construction yet, add a video.
  • subscribe
  • flag
  • login to download gpx or kml files.