• Old Hydro Line (Witless Bay)
  • Minor Issue / Yellow
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Mountain Bike Reporter Primary Activity
Trail is overgrown just before the rock face, needs to be cleared when cooler weather comes around. Also fairly wet ground so it won't be best after heavy rain. Hoping to build a skinny bridge to the left side of the path to get over all this the fall. Best to turn off at Overwatch until this is done.

Rock face and drainage below is cleaned up to ride. Small rock bridge built to the left at the bottom to ride onto Lower Flume Road.
  • trail work done

Previous Reports

statusdatedescription
Jul 3, 2020 @ 1:38pm
Jul 3, 2020
More wet along there today. Trail work completed includes laying some flat rock along the the more wet parts of the path, as well as cleaning away... view
Jun 30, 2020 @ 3:29pm
Jun 30, 2020
All low brush cleared and cut back. Full trail raked to cut newly cleared brush. Two lines cleared onto rock face - straight for a rougher ride,... view

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login