• Trail:
  • Green Loop (Bringle Lake)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The first bridge needs some boards replaced. It’d be a no-go for someone on a smaller sized tire.

Previous Reports

statusdatedescription
Jun 29, 2024 @ 11:14am
Jun 29, 2024
Work being done on a bridge. No passable at this time. Must go around the area. view
Dec 23, 2021 @ 8:54am
Dec 23, 2021
Trees are Down in several Places.. Low Hanging Vines numerous places.. view
Jun 19, 2021 @ 6:24am
Jun 19, 2021
view

0 Comments






  • 0
  • Share with followers