• Trail:
  • Full Tilt (The Tolt)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Removed wet ground on last section of trail before exit, rocked in and covered. Trees are in place to bridge a small wet section prior, but trail is still clear to ride. This should be completed in next several days.

Main bridge still requires attention - use caution.

Previous Reports

statusdatedescription
Aug 15, 2023 @ 11:57am
Aug 15, 2023
Wooden catch berm added at bottom of first steep - use caution as it's a new feature. view
Aug 12, 2023 @ 4:26pm
Aug 12, 2023
First bridge repaired - other pallet to be replaced in near future for longevity. view
Aug 12, 2023 @ 4:24am
Aug 12, 2023
First Bridge (Pallet) has become worn on entry and requires replacement. To be replaced in coming weeks, as well as catch berm added on the bottom... view

0 Comments






  • 0
  • Share with followers