Road construction and blasting beginning around September 21:

Mosaic will be building roads between Zipper and Meat Draw. This shouldn’t have a major impact on the trails other than closing the vicinity from time to time if blasting is scheduled. Trails will be signed as closed when blasting occurs, and users MUST stay out of the zones and respect all signage during these times. Expect that blasting could require occasional closing of Upper Meat Draw, Meat Draw, The Zipper, Rollercoaster. We anticipate all our works will be complete in early November.

Harvesting beginning around September 26:

Harvesting could begin less than two weeks from now and will impact portions of the trails listed below. Mosaic will sign all the trails as closed. Mosaic plans to do a clean of trails post-harvest. Mosaic expects to be finished in this area in a few months.
• Uterbraten, Uterbraten Climb and Kid Gorgeous

Previous Reports

statusdatedescription
Aug 22, 2026 @ 12:17pm
Aug 22, 2026
So fun! I love tech and slabs. Thank you builder!!! view
Jul 17, 2026 @ 1:58pm
Jul 17, 2026
What a trail 🤩 incredible slab lines through moss mixed in with steeps and tech. Worth it. view
May 24, 2026 @ 4:34pm
May 24, 2026
The downed tree below the steep switchback is cleared. view

0 Comments






Official Report

  • Nanaimo Trail Builders
  • NTB
  • 0
  • Share with followers