- Trail:
- Valentine SCT (Millennium Park)
- Status:
- Significant Issue / Amber
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
So this portion shown on the map circled in red is in maintained and ends with a 10’ drop to the ditch along the logging road . It does not go through . The sct connector is the proper trail through.
figskeeper
Dec 30, 2023 at 16:56