- Trail:
- Boca Loyalton Railroad Trail (Smithneck)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
Survived the fire, actually a more clear. Very bottom section was pruned and cleared of downed wood.
- Work Report:
- trail work done
- 1 volunteer attendees
- 2 volunteer hours
- 1 total workers
- 2.0 total work hours
Individual Workers:
Local Weather During Report
- Summary
PartlyCloudy - Temperature
16° (2°/16°) - Precip
0 mm/h - Wind
3.37 km/h - Cloud Cover
53% - Humidity
0.29
