- Trail:
- Borderline (River Bluff Trails Park)
- Status:
- Significant Issue / Amber
- Issue status: Complete
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
Major erosion (major ruts or slumping, large boulders and roots exposed due to erosion).. The drop-in was repaired , howver no tread repairs have been made.. major rutting throughout trail as well as brake bumps..some landing are rutty making them very sketchy... Storm drain needs cleaned out to avoid anymore rain washouts at drop in
Local Weather During Report
- Summary
MostlyClear - Temperature
18° (10°/28°) - Precip
0 mm/h - Wind
2.69 km/h - Cloud Cover
33% - Humidity
0.55
Previous Reports
4 Comments
- + 1
Lee-Clark
St Joseph May 15, 2025 at 11:20
Thank you for submitting this trail report. We have looked into these issues. Erosion was noted in the tread at the exit of the second berm and the approach to the hip jump below it. This has been repaired. Major erosion was reported. There is major erosion in the drain beside the hip jump. This was not repaired as "Borderline" is a black diamond trail as the drain is not designed to be a bypass for the feature. Boulders were seen and are becoming more exposed. These were intentionally placed during construction with the intention of becoming exposed as the trail matures to serve as a qualifier before the lower, mandatory drop onto raw terrain. As a reminder, Borderline is a black diamond trail. Roughness and difficulty are a part of that.
- + 2
Storm drain repeatedly fails after one storm because the trail entrance was built in the drain of Comeback. Comeback has been regraded and drains cut to divert water from Borderline entrance. We will monitor for possible tweaking. About half of upper Borderline has gotten erosion repair. Excessive moisture has delayed completion of repairs. We will monitor and continue repairs asap.