• Trail:
  • Project 9 Alt. 2 (Mount Fernie Provincial Park)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
P9 has had some more work done. There is now a third well-defined line through the rocky section and the three lines have been delineated by painted rocks. Pink, the right line, is the most straightforward and easiest. Start left and then turn right after a bit for the newest Yellow line - it's slower and more techy, with rock rolls and rock drops and a skinny. Stay left for the Orange line, which is faster, with some rock drops.

With all the new features, please ride with caution as there are unmarked gaps and drops on the trail. Preride, reride, freeride.

Local Weather During Report

  • Summary
    Drizzle
  • Temperature
    10° (10°/20°)
  • Precip
    0.05 mm/h
  • Wind
    3.18 km/h
  • Cloud Cover
    82%
  • Humidity
    0.8

Previous Reports

statusdatedescription
May 8, 2026 @ 7:47am
May 8, 2026
There is still water flowing down the trail in sections in the rock garden and snow near the jumps built/improved last season. There are quite a... view
Mar 30, 2026 @ 10:46am
Mar 30, 2026
view
Jul 11, 2025 @ 7:07am
Jul 11, 2025
The trail has had a significant amount of work and is riding great. Some trail features including gap jumps and drops have been added. As always,... view

0 Comments






  • 0
  • Share with followers