Description:
Green Hornet is being rebuilt, so at this point the top half of Teleport is two-way, while the top of Green Hornet is worked on. Then once that section is complete work will start on the lower section of Green Hornet and the lower half of Teleport will be two-way for a few weeks.
This report was generated from the activity log.