• Trail:
  • Sidewinder (Eagle Mountain)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Dirtbike/Moto
Description:
Rode yesterday 5/22. We found an alternative way in using an unmarked trail lower down the compressor station access rd, but it appeared people were accessing it right underneath the powerlines that are under construction closer to the compressor station as well. There was a construction/road flagger there but we didn't stop to ask if they were allowing access that far up the road.

Trail was not blocked, I think Fortis just wants people to be aware they are entering a construction zone. Be courteous and careful riding up the road!

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    11° (7°/17°)
  • Precip
    0 mm/h
  • Wind
    3.52 km/h
  • Cloud Cover
    26%
  • Humidity
    0.82

Previous Reports

statusdatedescription
Aug 31, 2025 @ 1:30pm
Aug 31, 2025
Trail is open and in great condition. view
Apr 19, 2025 @ 1:59pm
Apr 19, 2025
Trail is marked as closed Nov 2024 - Nov 2025 for pipeline construction on the mountain view
Oct 24, 2024 @ 5:35pm
Oct 24, 2024
"all clear" after atmospheric river, still technically closed for unrelated construction. view

0 Comments






  • 0
  • Share with followers