• Trail:
  • Jewell Park Trail (Jewell Park)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The first bridge after the cemetery gate is falling down. Left side entrance to the gate has fallen and gets a little worse every day. There is no easy way around this crossing. Currently it's rideable, but it's just a matter of time.

The next creek crossing is where THOR replaced a fallen bridge with a culvert in spring 2026.

Local Weather During Report

  • Summary
    Clear
  • Temperature
    30° (16°/30°)
  • Precip
    0 mm/h
  • Wind
    6.39 km/h
  • Cloud Cover
    4%
  • Humidity
    0.53

Previous Reports

statusdatedescription
Jun 30, 2026 @ 11:46am
Jun 30, 2026
Down tree over trail on climb, should be removed. view
May 29, 2026 @ 10:37am
May 29, 2026
Laurie, John and Bob corridor cleaning, full lap. view
May 26, 2026 @ 5:43am
May 26, 2026
Replaced broken bridge with culvert view

0 Comments






  • #4746188 - widget
  • 0
  • Share with followers