Description:
Worked on the flagstone paver armoring. It was loose in places so I revised a few rocks.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 2 volunteer hours
  • 1 total workers
  • 2.0 total work hours
Individual Workers:
scottyvnc
hours: 2
paid: no

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    30° (20°/30°)
  • Precip
    0 mm/h
  • Wind
    4.8 km/h
  • Cloud Cover
    25%
  • Humidity
    0.6

0 Comments






Official Trail Reporter i

  • Piedmont Fat Tire Society - Trail Boss
  • PFTS Boss
  • 1
  • Share with followers