- Trail:
- Lavezzola Creek OHV Trail (Upper Doubletrack) (Downieville Trail Network)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
I rode the newly completed Upper Lavezzola Creek trail that bypasses the old 1.5 mile trail with a 4.6 mile low-gradient/multiple switchback trail. It's awesome. 98% rideable up on my Turbo Levo, with a handful of switchbacks that will be feasible after better trail compaction and loose rock removal.
Local Weather During Report
- Summary
Clear - Temperature
13° (12°/24°) - Precip
0 mm/h - Wind
3.62 km/h - Cloud Cover
0% - Humidity
0.54
