Several fall trees/large branches removed on the top 1/3rd of the trail (Above Red fox). New access laid out on the ridge down to the area behind the ranger's garage. Several new benches were laid out and staked down, too wet to dig them in. Most of the top 1/3rd was raked out as well. the few small jumps need dirt work still before the race.
  • trail work done
  • 3 volunteer hours
  • 1 attendees
  • 3 total work hours

Previous Reports

statusdatedescription
Mar 19, 2019 @ 6:56am
6 hours
small tree down after the last chute between the two creek crossings. view
Mar 12, 2019 @ 10:55am
Mar 12, 2019
Bench cuts/berms added to the first two turns. There is a tree down after the "carnage corner" attempting to cut tonight. view
Jan 3, 2019 @ 1:01pm
Jan 3, 2019
Trees Have been cleared from top to bottom Trail is raked top to bottom. view

0 Comments


Post a Comment



You must login to Pinkbike.
Don't have an account? Sign up

Join Pinkbike  Login