- Trail:
- Freestyle (Scenic Hill)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Variable - some wet spots, or some dusty spots but overall good conditions
- Reporter Primary Activity:
- Mountain Bike
Description:
Rocks removed from top half of trail.
Loose gravel scraped off trail.
Two trees removed from end of first wallride.
Wallride exit pushed back slightly to exit directly onto trail rather than across it.
Cut a heap of overhanging branches off trees.
Cut and filled trail.
Loose gravel scraped off trail.
Two trees removed from end of first wallride.
Wallride exit pushed back slightly to exit directly onto trail rather than across it.
Cut a heap of overhanging branches off trees.
Cut and filled trail.
- Work Report:
- trail work done
- 2 volunteer attendees
- 4 volunteer hours
- 2 total workers
- 4.0 total work hours