Trail Spinners Trail Work Day: Land of Promise Trail Trimming
Trail Day Details:

5/18/25 @ 8am-12pm

Meeting point: Maintenance Shed gravel lot - 4122 Wilkinson Road, Havre de Grace, MD

The plan: Trim the overgrowth on Land of Promise Trail and begin to repair erosion/trouble spots if time allows.

Note: Due to the turnout of the first trail work day and the reduced power tool availability, if you have trimming tools (hedgers, pole hedgers, brush cutters, hand saws, loppers, etc), bring it with you just in case. I caution against bringing chainsaws. We had a small battery operated one and a recip saw which worked out fine. They would be used sparingly. We aren’t out there tearing down all the trees

Comments






Login or Sign Up to Comment

Trail

close
3D
Trail Conditions
  • Unknown
  • Snow Groomed
  • Snow Packed
  • Snow Covered
  • Snow Cover Partial
  • Freeze/thaw Cycle
  • Icy
  • Prevalent Mud
  • Wet
  • Variable
  • Ideal
  • Dry
  • Very Dry
Directions to land-of-promise-trail trailhead (39.607120, -76.144700)
1.6 miles
Distance
358 ft
Climb
-231 ft
Descent
00:14:49
Avg time
view trail detail
Audience: city
[flag]