• Jacks Region Status
    Jul 19, 2026
trail condition date description
Charlie's Cycle Climb Ideal
Jul 19, 2026 @ 10:23pm
Jul 19, 2026
Rode most of it on July 18, 2026. It’s great. Needs riders to bring it back to life.
Christine's Cutline Cruise Variable
Jul 13, 2026 @ 5:44pm
Jul 13, 2026
Ride the cutline and take the machine built reroute to the right that avoids the wet ground. Reconnect on the original cutline trail that was brushed in June widening it out from the alder and willow and poke your way out to Cache Percotte road.
Dan's Deadly Downhill Variable
Jul 13, 2026 @ 5:46pm
Jul 13, 2026
The trail was brushed of the nasty overgrowth of alder in June 2026 but not yet summer vegetation trimmed. It was clear of trees and scheduled for a July trimming to make it summer ready.
Erin's Extreme Ending Variable
Jul 13, 2026 @ 5:38pm
Jul 13, 2026
Trail is not connected because of Trans Mountain Pipeline construction. One can ride work their way on the pipeline and cross the creek and catch the trail from the powerline side. Once at the powerline the trail was brushed earlier in the year and then trimmed again on July 12, 2026 to connect with Charlie's in the Plainsman property.
Helen's Holy Hills Variable
Jul 13, 2026 @ 5:42pm
Jul 13, 2026
Two new bridges built across Cache Percotte Creek. Still a tough climb and needs some brushing of rose bushes and a bit more benching and trail work on the furthest south bridge reroute. The trail is rideable with some great work by HMBA that is in progress. If you don't like the hills, enjoy the coolness of the creeks and take a connector trail along the creek slope break and bypass the hills entirely.
Jack's Connector (Road) Snow Covered
Nov 3, 2017 @ 10:54am
Nov 3, 2017
Snowed November 1st 2017
Jenny's Jungle Jam Variable
Jul 13, 2026 @ 5:35pm
Jul 13, 2026
Trail has been brushed earlier in the year and the grass trimmed on July 12, 2026 to support regular riding. New bridge on the south end and HMBA completed south trail improvements to connect to Helen's Holy Hills.
Sherry's Soaking Swamp Ideal
Jul 13, 2026 @ 5:49pm
Jul 13, 2026
The trail had redecking of the teeter totter, north bridge and extensive boardwalks installed in 2025. The swamp might be soaking but that doesn't mean your ride needs to be thanks to the 24" wide boardwalk sections. The trail was clear of deadfall in Early July and the seismic portion connecting to Erin's/Jenny's was trimmed July 12 to support your riding pleasure.
Thompson Lake Trail / Frisbee Golf Course Dry
Jun 24, 2021 @ 9:42am
Jun 24, 2021
reporter New start at entrance of Frisbee Golf parking lot - the through trail across Robb Road is being reclaimed.
Displaying 1 - 9 of 9
  • Previous Page
  • Next Page