• Trail:
  • Stuart Peak (The Rattlesnake)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
On 5/27/20, we were able to clear all the trees between the intersection with Snowbowl overlook and the second switchback after the creek crossing with folding saws, but there are two very large trees down before the creek crossing that will require chainsaws. Beyond the second switchback there are likely numerous additional small and large trees.

Previous Reports

statusdatedescription
Aug 4, 2026 @ 4:59pm
Aug 4, 2026
One real big tree down about 0.5 mile below the culvert. Otherwise riding great! view
May 29, 2026 @ 12:39pm
May 29, 2026
2/3 downed trees at beginning of the trail view
May 29, 2026 @ 12:37pm
May 29, 2026
3/3 downed tree view

3 Comments

  • + 1
 Thank you for the all the saw work! I had a good ride today up to where you finished cutting. Crossed over one tree just around the switchback from where you stopped. Then looked up the trail and there were 5 more downed trees.
  • + 1
 I’ll try and get back before too long and cut some of the smaller ones but those big ones will require a chainsaw. One is laying on the trail lengthwise the other is huge
  • + 0
 Pop r





  • 0
  • Share with followers