- Trail:
- Plus Vite (B&K)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
Built a connection to the new exit line so you can keep the speed up and flow directly into the bottom third. Also added a new connection from the bottom spur to Wagon Trail - cut right, cross the stream and look for the drop in to the left (or loop around on the spur and session the last two jumps before heading out on Wagon Trail :-)).
- Work Report:
- trail work done
- 1 volunteer attendees
- 10 volunteer hours
- 1 total workers
- 10.0 total work hours
Individual Workers:
