Description:
Resurfaced berm with a step down kicker and resurfaced landing ramp. Improved drainage to prevent future erosion of landing ramp.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 3 volunteer hours
  • 1 total workers
  • 3.0 total work hours
Individual Workers:
Travbail
hours: 3
paid: no

Previous Reports

statusdatedescription
Apr 28, 2024 @ 10:44am
Apr 28, 2024
3/4 of the way down the grass is about 2m high and touching in the middle of the track for about ~30m. view
Mar 31, 2024 @ 9:52am
Mar 31, 2024
Bit overgrown and narrow in places otherwise not to bad. Few nails on old wood features between gaps. view
Sep 11, 2021 @ 4:58pm
Sep 11, 2021
Minor erosion (trail braiding, small ruts developing, brake bumps) view

0 Comments






  • 0
  • Share with followers