- Trail:
- Prewitt Ridge Trail (DH section) (Prewitt Ridge)
- Status:
- Closed / Red
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
No notable fire damage but the the trail is nonexistent until the very bottom. Where it once was, has been cut down by bulldozer and now overgrown. There are drainage trenches cut diagonally across the bulldozer tracks. The trenches and mounds are hard to see in tall grass, and are also very soft.
- Work Report:
- trail work done