• Trail:
  • Ninth Green at Nine (Blyth Park)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
There used to be a little flat diving board lip so you could pop right over the creek (see video). It eroded and fell apart this past spring, along with the landing zone on the other side. Too dry to re-build right now, but a small little bridge was the original plan anyways, so if anyone is up for putting one in, go for it!

Previous Reports

statusdatedescription
Oct 15, 2026 @ 6:12pm
Oct 15, 2026
Trail running great but they’re doing construction at the bottom of it in the park so it drops you out in a fenced off area with no way to get... view
May 6, 2026 @ 9:10pm
May 6, 2026
The trail is running great, but the plywood bridge at the bottom of the steep chute is rotten and failing. It will not last much longer. Be very... view
Apr 18, 2025 @ 10:37am
Apr 18, 2025
Everything at Blyth is running really well. Great dirt right now. Someone built a mini-table over the first log after the steep descent. It makes... view

0 Comments






  • 0
  • Share with followers