- Trail:
- AM/PM (Cheakamus)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Variable - some wet spots, or some dusty spots but overall good conditions
- Reporter Primary Activity:
- Mountain Bike
Description:
Trail running well. Did some drainage checking on lower half and then sorted out the drainage/erosion rut after second rock roll. Moved where the water will run by building up berm and cutting low channel on far inside of turn, then allow sheeting of run-off across large swath. Both turns buffed and re-bermed to encourage less braking (less erosion) and smoother transition turn-to-turn. Enjoy.
Just the top rock roll to fix up if we get another spell between storms.
Just the top rock roll to fix up if we get another spell between storms.
- Work Report:
- trail work done
- 2 volunteer attendees
- 4 volunteer hours
- 2 total workers
- 4.0 total work hours