- Trail:
- Sierra Vista South Perimeter Trail (Sierra Vista Park)
- Status:
- Minor Issue / Yellow
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- E-Bike
Description:
Needs a lot of work as there are several potholes in the trail.
This report was generated from the activity log.